Ganttly Project Timeline
Claude connectorCommunityBuild Gantt charts and project timelines with the critical path, float, and milestones on business days, and test how task slips move the f…
- Tools
- 2
exposed by this connector
Movement
From our daily snapshots over the last 30 days.
Rank by popularity
Rank by trending score
Popularity score
Trending score
In its category
How this connector compares with others in the same category. Positions are counted within the category, not across the whole directory.
Productivity2,335th of 3,353 by popularity · not ranked by trending score
| # | Connector | Popularity | Trending | 7d |
|---|---|---|---|---|
| 2333 | 3,322 | — | 367places down | |
| 2334 | 3,322 | — | 526places down | |
| 2335 | 3,322 | — | — | |
| 2336 | 3,322 | — | 360places up | |
| 2337 | 3,322 | — | 281places down |
This connector isn’t ranked by trending score, so the category’s top connectors are shown instead.
| # | Connector | Trending | Popularity | 7d |
|---|---|---|---|---|
| 1 | 5,294,756 | 12,612 #295 | 9places up | |
| 2 | 2,341,055 | 12,980 #259 | 37places up | |
| 3 | 1,435,721 | 9,320 #705 | — | |
| 4 | 1,376,812 | 7,814 #1001 | 19places up | |
| 5 | 1,314,299 | 7,679 #1027 | — |
More from Zovo
All listings by ZovoTomatick Focus Timer#4687 of 6,108 by popularity
NameTrend Baby Names#4958 of 6,108 by popularity
Bingo Card Maker#5388 of 6,108 by popularity
Bracketeer Tournament Maker#5388 of 6,108 by popularity
Netwise Paycheck Calculator#5388 of 6,108 by popularity
Printable Calendar Maker#5388 of 6,108 by popularity
6 more on the publisher’s page.
Ganttly Project Timeline builds a project schedule and Gantt chart from a task list using the critical path method (CPM). It is used by project managers, team leads, consultants, and students planning a thesis.
List tasks with durations, dependencies, and a start date. Ganttly returns early start, early finish, late start, late finish, and total float for each task, the critical path, milestones, and the project end date.
Calendars: plan on business days that skip weekends and the public holidays of a chosen country (with regional holidays, local weekends such as Friday-Saturday, and your own days off such as a year-end shutdown), or on plain calendar days. Durations can be given in days or weeks. Dependencies are finish-to-start and can carry a lag ("Design+2") or a lead ("Build-3"). Tasks can have a start-no-earlier-than date, an owner, or be zero-length milestones.
The interactive chart has a day and week axis, task bars, dependency arrows, the critical path in red, float after each bar, milestone diamonds, and a today line. Tap a task for its dates and float, and test a slip to see the new end date and critical path.
What-if analysis compares up to four scenarios against the plan, for example how far a 5-day slip moves the finish and which tasks become critical.
Downloads: a CSV schedule, an .ics calendar file with milestones and task start dates, and an SVG image of the chart for slides and documents.
The schedule is computed by deterministic code, so the same inputs give the same dates. Dependency loops and unknown task names are explained in plain language.
Example: "Make a Gantt chart starting 2026-11-02: Design 5 days; Build 10 days after Design; Test 4 days after Build; Docs 3 days after Design; Launch milestone after Test and Docs."
Limitations: finish-to-start links only (no start-to-start or finish-to-finish), whole-day scheduling, and no resource levelling, costs, or progress tracking. Plans are not saved or synced with project tools.
Tools
- compare_timeline_scenarios
- plan_project_timeline
- Categories
- Sign-in
- Not required
- Connector URL
- https://gantt-timeline.zovo.one/mcp
- Transport
- Streamable HTTP
- Works with
- Claude, Claude API, Claude Code, Claude Desktop
- Added
- October 3, 2026
- More info
- Sponsorship
- Promote this connector