WSH Risk Assessment
ChatGPT pluginCreate risk assessments
- Featured
- No
not on the featured shelf
Movement
From our daily snapshots over the last 30 days.
Rank by placement
Rank in Productivity
In its category
How this plugin compares with others in the same category. Positions are counted within the category, not across the whole directory.
Productivity1,163rd of 1,371 by placement
| # | Plugin | Position | 7d |
|---|---|---|---|
| 1160 | #5307 | — | |
| 1161 | #5308 | — | |
| 1162 | #5310 | — | |
| 1163 | #5311 | — | |
| 1164 | #5313 | — | |
| 1165 | #5316 | — | |
| 1166 | #5318 | — |
Supports distinct workflows for creating risk assessments, independently reviewing existing assessments, planning and verifying corrective controls, and communicating approved risk information to workers.
Example prompts
- “Create a WSH risk assessment for this work activity.”
- “Review this existing risk assessment and report its gaps.”
- “Turn these risk-control gaps into an implementation plan.”
Skills
wsh-risk-assessment
Create a new workplace safety and health risk assessment aligned with Singapore's WSH Risk Management Code of Practice. Use for task decomposition, hazard and consequence identification, existing-control evaluation, 5x5 risk evaluation, additional-control selection, and projected residual risk. Do not use merely to audit an existing RA or track control implementation.
wsh-risk-assessment-review
Independently review an existing Singapore WSH risk assessment for omissions, weak causal wording, unsupported ratings, control gaps, duplication, and optimistic residual risk. Use for audit, challenge, or gap assessment; revise the source table only when requested.
wsh-risk-communication
Turn an approved or clearly identified draft WSH risk assessment into audience-appropriate worker briefings, toolbox-talk material, quizzes, or visual-content briefs. Use for communication and comprehension checking, not for creating, approving, or changing risk conclusions.
wsh-risk-control-planning
Convert accepted WSH risk-assessment gaps or recommendations into an implementation and effectiveness-verification plan. Use for hierarchy-of-control selection, owners, deadlines, interim protection, evidence, and residual-risk confirmation; do not treat planned controls as implemented.
- Categories
- Made by
- Goh Keng Beng
- Sign-in
- On Install
- Capabilities
- Interactive, Write
- Availability
- Available
- Version
- 1.0.0
- Created
- August 23, 2026