Zovo Project Timeline
ChatGPT pluginGantt charts & critical path
A Gantt chart maker and project timeline planner that works inside the chat. List your tasks with durations and dependencies and a start date, and Zovo Project Timeline builds the schedule with the critical path method (CPM): early start, early finish, late start, late finish and total float for every task, the critical path, your milestones and the project completion date.
Plan on business days that skip weekends and the public holidays of the country you choose (with regional holidays, local weekends such as Friday-Saturday where they apply, and your own days off such as a year-end shutdown), or on plain calendar days. Durations can be given in days or weeks. Dependencies are finish-to-start and can carry a lag ("Design+2") or a lead ("Build-3"); tasks can have a start-no-earlier-than date, an owner, and zero-length milestones.
The interactive Gantt chart has a day and week time axis, task bars, dependency arrows, the critical path in red, float shown after each bar, milestones as diamonds and a today line. On a phone the chart scrolls sideways while task names stay pinned. Tap any task for its dates and float, and test what happens if a task slips: the new end date and critical path appear in the card.
Ask what-if questions in the chat too, for example how many days a slip moves the finish and which tasks become critical; Zovo Project Timeline compares up to four scenarios against the plan.
Downloads: a CSV schedule for spreadsheets, an .ics calendar file with milestones and task start dates, and an SVG image of the Gantt chart for slides and documents.
The schedule is computed deterministically, so the same inputs always give the same dates. Dependency loops and references to tasks that do not exist are explained in plain language, naming the tasks involved.
Limitations: finish-to-start links only (no start-to-start or finish-to-finish), whole-day scheduling without resource levelling, costs or progress tracking, and plans are not saved or synced with project tools.
- Featured
- No
not on the featured shelf
Movement
From our daily snapshots over the last 30 days.
Rank by placement
Rank in Productivity
In its category
How this plugin compares with others in the same category. Positions are counted within the category, not across the whole directory.
Productivity1,915th of 2,680 by placement
| # | Plugin | Position | 7d |
|---|---|---|---|
| 1913 | #8163 | — | |
| 1914 | #8164 | — | |
| 1915 | #8167 | — | |
| 1916 | #8169 | 217places up | |
| 1917 | #8191 | — |
Also on other marketplaces
More from Zovo
All listings by ZovoInviteKit Calendar Files#6311 of 10,704 by placement
Mergewell Mail Merge#6718 of 10,704 by placement
Tallyproof Statement Converter#6737 of 10,704 by placement
Rotawise Shift Scheduler#6757 of 10,704 by placement
Moon & Star Map#6776 of 10,704 by placement
GridSmith Puzzle Maker#6809 of 10,704 by placement
53 more on the publisher’s page.
Example prompts
- “Gantt chart 2026-11-02: Design 5d; Build 10d after Design; Test 4d after Build; Docs 3d after Design; Launch after Test & Docs”
- “Find the critical path and float: A 3d; B 5d after A; C 2d after A; D 4d after B and C. Start 2026-11-02, calendar days”
- “What if Build slips 5 days? Design 5d; Build 10d after Design; Test 4d after Build; Docs 3d after Design. Start 2026-11-02”
Skills
gantt-timeline
Gantt chart maker and critical path calculator. Use plan_project_timeline to schedule a task list (durations, dependencies, milestones) into a Gantt chart with early/late dates, float, the critical path, the end date and CSV, .ics and SVG files; use compare_timeline_scenarios for what-if slips.
- Categories
- Sign-in
- On Install
- Capabilities
- Interactive, Read
- Availability
- Available
- Version
- 1.0.0
- Keywords
- gantt chart maker, gantt chart generator, project timeline, critical path method, CPM, project schedule, milestones, total float, business days, project plan
- Created
- October 3, 2026
- More info
- Sponsorship
- Promote this plugin